What clients say after the readings settle
Feedback from smallholdings, guesthouses and body corporates we have worked with across Gauteng and the Western Cape. Each note ties back to a measured change at the tap, not a slogan.
Hartbeespoort smallholding
The basins used to go rust-brown within a week. After the iron and manganese skid went in, the washing comes out clean and we stopped buying drinking water. The drain line to the soakaway was the part I was worried about and it was handled without fuss.
Borehole iron removal, two-stage filtration skid
Stellenbosch guesthouse
Our borehole chemistry was fine but the bacterial counts moved around after heavy rain. The sediment filter and UV stage were sized for six rooms filling up in the morning, and the sample tap after the UV makes our quarterly lab checks straightforward.
UV disinfection and sediment filtration
East Rand body corporate
Pressure used to collapse the moment two units drew water. The old pressure switch was cycling constantly. With the variable-speed booster, the rebuilt tank stand and a correctly sized pressure vessel, the trustees finally have steady pressure and a cartridge schedule that everyone understands.
Booster pump, pressure vessel and JoJo tank stand
Farm supply, Western Cape
We run livestock and a household off the same borehole. The team logged the before-and-after readings on paper and left them in the pump room, so when something drifts we can see it early instead of guessing.
Borehole testing and sediment filtration
Guesthouse, East Rand
Trenching for the new supply line was kept shallow and marked so it did not cut into the irrigation runs. Small thing, but it saved us a weekend of repairs and the JoJo tank feed has been stable since.
JoJo tank plumbing and supply line
Smallholding, Gauteng
What stood out was the honesty about what the system would and would not do. No inflated claims, just the numbers from our own sample and a clear maintenance list for cartridge changes and UV lamp hours.
Rainwater harvesting and filtration setup